This paper takes a practical look at the procedures for consenting new infrastructure in Wales , through the Planning Act 2008 and the Hybrid Bill procedure , and consider the potential areas for challenge (including consultation , strategic environmental assessment and habitats issues) for those opposed to such infrastructure. Through recent case studies , the paper examines the tactics and procedure for such challenges.

PLP_Wales_2013_Turney_powerpoint_Challenging_new_infrastructure